Certification Testing Underway On B737 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Nov 18, 2010

Certification Testing Underway On B737 Performance Improvements

First Flights Conducted On A B737-800 Last Week

Certification flight testing has begun on a package of Boeing 737 performance improvements, including aerodynamic and engine changes, which the company expects will reduce fuel consumption by 2 percent. Testing and certification will continue through April 2011. Boeing is phasing the changes into production mid-2011 through early 2012. The first test flight was conducted last week on a  Boeing Next-Generation 737-800 in the new United Airlines livery.

One percent of the savings comes from reducing drag reduction. The upper and lower anti-collision lights change from round to a more aerodynamic, elongated teardrop shape. Wheel-well fairings are re-contoured to smooth the air flow near the main landing gear. A redesign of the environmental control system, exhaust vent and streamlined wing slat and spoiler trailing edges round out the aerodynamic changes.

CFM is introducing the new CFM56-7BE engine enhancement program to coincide with Boeing's airframe changes. Low- and high-pressure turbine modifications will result in a 1 percent reduction in fuel consumption. In addition, Boeing is optimizing the engine's primary nozzle and plug. Together, the changes result in cooler-running engines that may provide up to 4 percent lower maintenance costs.

Boeing says its continuous efforts to improve the Next-Generation 737 family have resulted in an accumulated 5 percent gain in fuel efficiency since the first airplane was delivered in 1998. It claims the new improvements will give operators an airplane that is 7 percent more efficient than the first Next-Generation 737s delivered.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (07.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

NTSB Prelim: Cessna 172

The Airplane Came To Rest Underneath A Set Of Damaged Power Distribution Lines On The Floor Of A Coulee On June 19, 2025, at 1412 mountain daylight time, a Cessna 172K airplane, N7>[...]

ANN's Daily Aero-Linx (07.10.25)

Aero Linx: FAA Managers Association (FAAMA) Recognized by the FAA, FAAMA is a professional association dedicated to the promotion of excellence in public service. The Association i>[...]

Classic Aero-TV: The Big Business of Diminutive Powerplants

From 2023 (YouTube Edition): Jet Central Micro-Turbine Engines Impress Founded in the late-1990s, Mexico City-based Jet Central produces a unique and fascinating line of micro-turb>[...]

Airborne 07.11.25: New FAA Bos, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC