Airliner Order Boom Appears To Be Cooling | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Dec 18, 2019

Airliner Order Boom Appears To Be Cooling

Grounding Of The 737 MAX Thought To Be A Major Factor

For the past several years, both Boeing and Airbus have announced huge orders for airliners, sometimes numbering in the hundreds of units. The buying spree by airlines has led to a backlog of more than $800 billion combined between the two planemakers.

But it looks now like that order boom is cooling, if not going bust, led in part by the lengthy grounding of the 737 MAX fleet.

CNBC reports that even Boeing now admits that the 737 MAX will not be flying again in 2019. “Boeing reaffirmed with the FAA that safety is our top shared priority, and we are committed to addressing all of the FAA’s questions as they assess Max certification and training requirements,” Boeing said in a statement after its CEO and commercial airline chief met with the agency in Washington D.C. “We will work with the FAA to support their requirements and their timeline as we work to safely return the Max to service in 2020.”

But there are other factors at play as well. Both Boeing and Airbus will begin the third decade of the 21st century looking at slowing air traffic growth and trade wars, according to the report. There is also lower demand for wide-body jets that command a higher price, which has led to the pending demise of the Airbus A380 super-jumbo jet.

The past 10 years have seen the two major planemakers amass orders for 20,000 airplanes, which is 66 percent above the previous decade.

 Now both Boeing and Airbus say their pipelines are full and they are having trouble keeping up with the pace for manufacturing and deliveries.
 
 (Image from file)

FMI: Source report

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC