Falcon 9 Static Firing Aborted | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 04, 2010

Falcon 9 Static Firing Aborted

Static Firing Was Aborted 1.1 Seconds Into A Planned 3 Second Burn

By Wes Oleszewski

Friday morning SpaceX's second Falcon 9 launch vehicle attempted a static firing test at Cape Canaveral's Launch Complex 40 in preparation for a December 7th launch. That launch will be the COTS-1 Demonstration mission. The static firing was aborted 1.1 seconds into a planned 3 second burn. It was later decided not to proceed with a second attempt and the static firing was given a 24 hour scrub.

The original schedule called for the static firing to take place at 9:00 am Eastern Time, however, the firing was subsequently delayed. When the process was resumed, ignition came at 1:00 pm, but was terminated automatically 1.1 seconds later. Reportedly an abnormally high chamber pressure in engine number 6 of the first stage's 9 engine cluster was sensed and the sequencer automatically shut down the vehicle. Although SpaceX's streamlined launch system allows for a very rapid recycle to another attempt at first stage firing, it was reportedly decided that there was not enough time remaining in the Easter Test Range's allotted window for the static test and the event was scrubbed for 24 hours. SpaceX announced that another attempt will be made on Saturday morning.

This was not the first time that a Falcon 9 launch vehicle has been dealt a post-ignition shutdown on the pad due to one of its 9 engines. The first Falcon 9, which launched on June 4th of this year, was also shut down at ignition. It was recycled and launched successfully the same day.

Three months prior to that event, however, that same booster aborted 2 seconds into its static test due to an engine issue that the sensors caught.

It is the goal of next week's launch to perform the first COTS demonstration flight where the Falcon 9 will place into orbit an active version of SpaceX's Dragon space capsule. That capsule is scheduled to make 3 orbits before reentering and parachuting to a Pacific Ocean splashdown. COTS, the Commercial Orbital Transportation Services, is a program by which NASA has contracted two private companies to transport cargo to and from the International Space Station following the retirement of the Space Shuttle.

FMI: www.spacex.com

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC