Endeavour Hydrogen Leak Repairs Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Wed, Jun 24, 2009

Endeavour Hydrogen Leak Repairs Continue

"Tanking Test" Set For Next Week

At NASA's Kennedy Space Center in Florida, teams are working to evaluate and repair a plate that attaches a gaseous hydrogen vent line to space shuttle Endeavour's external fuel tank. Hydrogen leaks in the area of the Ground Umbilical Carrier Plate, or GUCP, postponed Endeavour's launch attempts June 13 and 17, delaying its 16-day flight to the International Space Station.

The Ground Umbilical Carrier Plate platform was partially extended Monday to allow technicians to continue their ongoing engineering analysis and to verify exact measurements of the position of the plate. The explosive bolts that connect the vent line to the external tank were safely disconnected, and GUCP leak checks were performed at ambient temperatures using helium gas. No leaks were detected. Previously, the only time leaks were seen were during launch attempts when super cold hydrogen gas was being passed through the vent line.

The repairs will be confirmed by a "tanking test" within the next week, in which Endeavour's external tank will be filled with liquid hydrogen and liquid oxygen, just as it is before launch. If the repairs are successful, Endeavour's next launch attempt will be targeted for July 11 at 1939 EDT.

Today, Endeavour's astronauts will catch up on administrative work and take T-38 training jet flights from their home base at NASA's Johnson Space Center in Houston to El Paso and back.

FMI: www.nasa.gov

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC