Virginia Airport Runway Extension Approved | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Sep 21, 2010

Virginia Airport Runway Extension Approved

Federal Government To Pay All But 5 Percent Of The Cost

The FAA has approved a plan to extend the runway at Virginia Highlands Airport (KVJI) in Abingdon, finding "no significant impact" for the project. The extension was first proposed about 14 years ago, and local officials say that raising the 5 percent local and state money necessary to go with the 95% federal funds could take as much as a year, given the economy.

Airport Manager Mickey Hines told the Tri-Cities newspaper that it was not unusual for such projects to be 20 years from inception to completion.

According to AirNav, the current runway is 4471 feet long and 75 feet wide. The uncontrolled airport is publicly owned by the Virginia Highlands Airport Authority. There are 72 aircraft based on the field. Five of those are multi-engine pistons and seven are jets. There are also five helicopters and four ultralights. The airport averages 68 operations per day according to 2008 data, the latest available. 45% of that is transient GA, another 45% is local GA. The operations are rounded out by nine percent air taxi and one percent military operations.

The proposal is to extend the runway to 5,500 feet, making it able to accommodate 75 percent of the large aircraft weighing 60,000 pounds or less. There would also be additional safety areas constructed at each end of runway 6-24, and it would be widened 25 feet. The project would also require the re-location of State Route 611, according to documents on the airport website.

Hines said the next steps are land acquisition along with a design and engineering study. No date has been set for the onset of actual construction.

FMI: www.vahighlandsairport.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC