SpaceX Plans Next Cargo Demo Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Tue, Sep 06, 2011

SpaceX Plans Next Cargo Demo Flight

C2, C3 Missions Combined In Attempt To Accelerate Cargo Transport Capability To ISS

After the successful launch of the first SpaceX cargo demonstration flight (C1) in December 2010, SpaceX approached NASA with a plan to accelerate its cargo transportation capability by attempting to achieve the third cargo demonstration flight (C3) mission objectives on the second demonstration (C2) flight. C2 mission objectives include demonstrating ISS/Dragon communications and flight navigation, control, and contingency operations near ISS.

C3 mission objectives include demonstrating ISS proximity operations, berthing with the ISS, cargo transfer, and return to Earth. Operationally, the plan would be for SpaceX to successfully complete all the C2 mission objectives and then be given approval to rendezvous and berth with the ISS during the same flight.

According to Alan Lindenmoyer, Commercial Crew and Cargo Program Manager, "Combining C2 and C3 could accelerate cargo services to station by about two months." NASA will not relax or eliminate any technical or safety requirements; rather, the combination will allow SpaceX the opportunity to meet all the C2 and C3 milestone objectives in a single flight.

At this point, NASA has not identified anything that would preclude combining the C2 and C3 mission objectives and is proceeding with mission planning. However, SpaceX wants to deploy two commercial satellites (Orbcomm) from the F9 second stage. The addition of Orbcomm's payloads to the combined mission is under review. If the risks associated with the secondary payloads are determined to be acceptable, NASA will give formal approval to the combined mission execution.

Artist's Concept

The C2 Falcon 9 launch vehicle is currently at Pad 40, Cape Canaveral, and is undergoing final preparation for the mission. The integrated Dragon spacecraft is preparing for electromagnetic compatibility and thermal vacuum testing to verify the spacecraft's compatibility with ISS environments. The Dragon spacecraft is planned to be shipped from SpaceX's Hawthorne facility to Cape Canaveral in September.

FMI: www.spacex.com

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC