Lockheed Martin SBIRS Team Advancing To Follow-On Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Apr 10, 2009

Lockheed Martin SBIRS Team Advancing To Follow-On Production Phase

Will Add Three, Possibly Four More Satellites

Lockheed Martin's Space-Based Infrared System (SBIRS) team has submitted its proposal for the program's follow-on production phase and has completed a major Preliminary Design Review (PDR) milestone with the US Air Force. The SBIRS program is designed to provide early warning of missile launches, and simultaneously support other missions including missile defense, technical intelligence and battlespace awareness.

The SBIRS Follow-on Program, which will complete the SBIRS constellation, will add the third and fourth highly elliptical orbit (HEO) payloads as well as the third and an option for a fourth geosynchronous orbit (GEO) spacecraft.

The proposal, submitted on March 22, builds on the experience of prime contractor Lockheed Martin Space Systems, Sunnyvale, CA, and payload integrator, Northrop Grumman, Azusa, CA. in providing the SBIRS development program for the Space Based Infrared Systems Wing at the US Air Force Space and Missile Systems Center, Los Angeles Air Force Base, CA.

"With the submission of the full production proposal for the SBIRS follow-on program, the joint government-industry team is another step closer to making the planned constellation of this critical system a reality," said Col. Roger Teague the US Air Force SBIRS Wing Commander. "I salute the entire SBIRS team for their dedication and hard work and look forward to future mission success."

Working under an initial $370 million contract for advanced procurement phase, the team has successfully completed PDRs for the HEO & GEO payloads and systems along with critical components and subsystems. With the completion of the SBIRS follow on program PDR phase, the program team will transition to the Critical Design Review (CDR) stage, followed by the production phase.

"Successful completion of the PDR phase will allow us to move efficiently into the next phase of this essential program," said Jeff Smith, Lockheed Martin's SBIRS Vice President. "We look forward to building on our close customer partnership as we strive to achieve operational excellence on this critical system."

Lockheed Martin's current SBIRS contract includes the two HEO payloads now on-orbit, two GEO satellites, as well as ground-based assets to receive and process the infrared data. Contract award for the additional GEO spacecraft and HEO payloads is expected in late 2009.

FMI: www.lockheedmartin.com/sbirs/

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC