USAF Moves Forward With Future Bomber | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 15, 2014

USAF Moves Forward With Future Bomber

RFP Issued July 9, Contract Award Anticipated In Spring 2015

The U.S. Air Force released its Long Range Strike Bomber, or LRS-B, request for proposal July 9 with a contract award expected in spring 2015. The new bomber is a top modernization priority for the Air Force and will provide the United States with the option to hold any target at risk at any point around the world.

“The LRS-B will be an adaptable and highly-capable system based upon mature technology,” said Secretary of the Air Force Deborah Lee James. “We have established an achievable and stable set of requirements that should make this capability a hallmark for the future. We’ve set a realistic target cost for the system and have a procurement strategy which allows us to affordably field a new bomber fleet. The program’s strategy will ensure we get the best possible deal for the taxpayer.”

The new bomber will be a long-range, air-refuelable, highly survivable aircraft with significant nuclear and conventional stand-off and direct-attack weapons payload. The LRS-B will provide operational flexibility across a wide range of military operations.

"The long range strike bomber will be essential to our ability to win a full-spectrum conflict in the future. It is a must-have capability," said Air Force Chief of Staff General Mark Welsh.

The Air Force plans to purchase 80-100 LRS-B aircraft at a $550 million average unit procurement cost in base year 2010 dollars with an initial capability in the mid-2020s.

A request for proposal, or RFP, defines a future contract’s requirements and informs industry on how to respond in their proposals. Release of the RFP precedes competitive selection based on contractor proposals.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC