Shuttle Crew Checks Out Equipment For Return To Flight Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 22, 2005

Shuttle Crew Checks Out Equipment For Return To Flight Mission

The astronauts of the Space Shuttle Discovery got a chance to work with some of the equipment they will be taking to space. Flight commander Eileen Collins and her crew were at NASA's Kennedy Space Center, Fla., for the Payload Crew Equipment Interface Test.

The Return to Flight mission of the Space Shuttle (STS-114) is targeted for launch during a window from May 15 to June 3. Returning the Shuttle to flight and completing the International Space Station are the first steps in the Vision for Space Exploration, a stepping-stone strategy toward new exploration goals. STS-114 is the first of two test flights following the Columbia accident. The seven-member Discovery crew will fly to the Station to evaluate procedures for flight safety, including orbiter inspection and repair techniques, and will deliver much-needed supplies.

The astronauts performed tests today to ensure the equipment for the mission's three spacewalks worked properly, and they inspected the cargo containers installed in the Italian-built Multi-Purpose Logistics Module, called Raffaello. They performed fit checks on the Thermal Protection System (TPS) repair sample box, the Control Moment Gyro (CMG), and the External Stowage Platform-2 (ESP2).

The sample box contains pieces of the Shuttle's heat-shielding tile. The samples will enable the crew to test new on-orbit repair techniques recommended by the Columbia Accident Investigation Board.

The new gyroscope will replace an inoperable one on the International Space Station. CMGs provide attitude control for the Station, keeping it properly positioned in space. The ESP2, similar to a large toolbox, will carry replacement parts to the Station. The platform will be deployed, attached to the Station's airlock and used as a permanent spare parts facility.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC