Fri, Jun 21, 2013
Process Is Expected To Last Several Weeks
NASA is beginning a preliminary design review for its Space Launch System (SLS). This major program assessment will allow development of the agency's new heavy-lift rocket to move from concept to initial design.
The preliminary design review process includes meticulous, detailed analyses of the entire launch vehicle. Representatives from NASA, its contractor partners and experts from across the aerospace industry validate elements of the rocket to ensure they can be safely and successfully integrated.
"This phase of development allows us to take a critical look at every design element to ensure it's capable of carrying humans to places we've never been before," said Dan Dumbacher, NASA's deputy associate administrator for exploration systems development in Washington. "This is the rocket that will send humans to an asteroid and Mars, so we want to be sure we get its development right."
The review process will take several weeks and is expected to conclude this summer.
"The preliminary design review is incredibly important, as it demonstrates the SLS design meets all system requirements within acceptable risk constraints, giving us the green light for proceeding with the detailed design," said Todd May, manager of the SLS Program at NASA's Marshall Space Flight Center in Huntsville, AL. "We are on track and meeting all the milestones necessary to fly in 2017."
The SLS is targeted for a test launch with no crew aboard in 2017, followed by a mission with astronauts to study an asteroid by as early as 2021. NASA is developing the SLS and its new Orion spacecraft to provide an entirely new capability for human exploration. It will be flexible for launching spacecraft for crew and cargo missions, expand human presence beyond low-Earth orbit and enable new missions of exploration in the solar system.
(Images provided by NASA)
More News
Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]
ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]
Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]
Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]
Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]