AD: Viking Air Limited Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Feb 22, 2018

AD: Viking Air Limited Airplanes

AD NUMBER: 2018-04-02

PRODUCT: Viking Air Limited Models DHC-6-1, DHC-6-100, DHC-6-200, DHC-6-300, and DHC-6-400 airplanes.

ACTION: Final Rule.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and address an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as aileron cable wear; fouling at the wing root rib, fuselage skin, and wing root rib fairlead; and/or fraying of the cable from the root rib fairlead.

DATES: This AD is effective March 27, 2018.

COST: The FAA estimates that this AD will affect 141 products of U.S. registry. Compliance with the basic requirements of the AD will take an estimated 20 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour.
Based on these figures, the estimated cost of this AD on U.S. operators to be $1,700 per product.

In addition, the following is an estimate of possible necessary follow-on replacement actions:

  • Replace One Cable - $754 per aircraft for parts and labor
  • Replace 2 cables (on the same wing) - $1,138 per aircraft for parts and labor
  • Replace 2 cables (one on each wing) - $1,508 per aircraft for parts and labor
  • Replace all 4 cables (2 per wing) - $2,336 per aircraft for parts and labor
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC