UAL Making Deals | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Feb 04, 2003

UAL Making Deals

Airports Don't Want to Foot the Bills for 'Deadbeat' Airline

United has asked the Bankruptcy Court for six more months, to figure out just which airport gates and other facilities (if any) it won't want. In the meantime, the cities, 'cooperating' by court order, don't want United to skate on fees, until the airline makes up its mind; or until the Court renders some sort of formal decision.

Los Angeles, according to the Nando Times, says United already owes it over $2, for December and January; and it doesn't want to have United have the very real chance to operate there for free, for what could be six months more -- or longer. Other airport managements, including those in Detroit and Cleveland, are equally concerned.

Under Chapter 11 of the US Bankruptcy Code, United may have the court-sanctioned privilege to break leases on gates, terminal space, etc. The official deadline (60 days from filing Chapter 11) is Friday; but United notes that these types of decisions, especially when balanced against other big logistical decisions (like mothballing aircraft, or not accepting contracted-for planes), is taking longer than it would like.

On the other hand, the airports argue, United, by the very nature of its being protected under Chapter 11, has already called in a lot of goodwill; and the airports have bills to pay, as well.

If nothing else, the airport managers would like United to be compelled to at least pay its current bills, as it makes up its mind.

FMI: www.ual.com

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC