F-35 Program Flight Test Progress Report Shows Key Milestones Achieved | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Mon, May 16, 2011

F-35 Program Flight Test Progress Report Shows Key Milestones Achieved

Over Three Hundred Thirty Test Flights Completed Since The Beginning Of The Year

Since the last F-35 flight test program update issued March 31, Lockheed Martin F-35 Lightning II aircraft have conducted 125 test flights, bringing the total number of flights for the year to 331.

Several flight test key milestones were accomplished since the last report:

  • The F-35 program flew the most flights ever recorded on one day (May 6) when a combined total of eight test flights were completed at all three of its flight test locations. (Edwards AFB, CA; Fort Worth, TX, and Naval Air Station Patuxent River, MD.)
  • The U.S. Air Force accepted into its fleet the first of a planned 1,763 production-model F-35 Lightning II stealth fighters when AF-7 was delivered to Edwards Air Force Base, CA, on May 6.  It is the first aircraft from Low Rate Initial Production (LRIP) lot one delivered.
  • The first F-35A production aircraft that will be delivered to Eglin Air Force Base, FL, accomplished its first flight on May 6. Known as AF-8, the aircraft will be delivered to Eglin for pilot and maintainer training later this year. This jet is the first aircraft to fly from Low Rate Initial Production lot two.  
  • The second F-35C carrier variant (CV), known as CF-2, completed its first flight April 29.  Later this month it is scheduled to be delivered to the F-35 test fleet at Naval Air Station Patuxent River, MD, (PAX).
  • The program recorded the 300th System Development and Demonstration flight of 2011 on May 6.
  • At Edwards, F-35s passed the 250 flight mark of the conventional takeoff and landing (CTOL) variant on May 5.  The first test jets, AF-1 and AF-2, arrived there on May 17, 2010.
  • Two more F-35B short takeoff /vertical landing (STOVL) jets, BF-3 and BF-4 performed their first vertical landings.  BF-4 flew its mission on April 27 and BF-3 on April 29. STOVL jets have conducted 94 vertical landings to date in 2011.

The following totals and highlights capture the overall flight test activity since March 31, and cumulative totals for 2011:

  • F-35A (CTOL) aircraft conducted 57 flights.  In 2011, CTOL jets have flown 146 times.
  • F-35B (STOVL) aircraft conducted 43 flights.  In 2011, STOVL aircraft have completed 144 flights and 84 vertical landings.
  • F-35C (CV) aircraft accomplished 25 flights.  In 2011, CV jets have flown 41 times.

From the start of flight testing in December 2006 through Tuesday, F-35s have flown 878 times.

FMI: www.lockheedmartin.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC