EASA Emergency Airworthiness Directive For Leonardo Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Nov 13, 2024

EASA Emergency Airworthiness Directive For Leonardo Helicopters

Affects Main Landing Gear On AB139 And AW139 Models

On November 11, 2024, the European Union Aviation Safety Agency issued an Emergency Airworthiness Directive (EAD) affecting all serial numbers of AB139 and AW139 helicopters.

The AD affects the main landing gear (MLG) shock absorber assembly. There have been reported instances of a broken eye end of the MLG shock absorber piston rod, which subsequent investigation determined the cause was fatigue cracking.

If not detected and corrected, the condition could lead to structural failure of the MLG resulting in damage to the helicopter and possible injury to occupants. Helicopters in Group 1 have the affected part installed while those in Group 2 do not have the affected part installed.

This AD supersedes a previous AD issued in April 2024 for the same condition. Leonardo had issued a Service Bulletin (SB) providing inspection and replacement instructions and the AD required Special Detailed Inspections of the affected parts.

Since the issuance of the April AD, new occurrences of broken shock absorber eye ends have been reported, and investigation determined that the inspection interval had to be reduced. Subsequently, Leonardo issued a revised SB with instructions for new compliance times.

Accordingly, this AD reduces the inspection compliance time. The AD is to be considered an interim action and further AD action may follow.

FMI:  www.leonardo.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC