AeroSports Update: MVP Aero To Build A Prototype In Maine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Jan 28, 2016

AeroSports Update: MVP Aero To Build A Prototype In Maine

The Minnesota Based Company Will Build The Prototype Of Its Multi-Capable Light Sport Aircraft At Brunswick Landing

When the MVP Aero multipurpose light sport airplane was introduced in its mockup stage at EAA AirVenture 2014, it was a showstopper. Designed for operation on land, water, and snow, it can also be used as a fishing boat or be converted into a camping tent.

The project has been underway for a while and has now developed to the point where MVP Aero has selected a location to build its first prototype, according to an article in the Bangor Daily News. According to the report, the prototype will be constructed at the former Navy Airbase at Brunswick Landing, Maine.

It’s reported that the Midcoast Regional Redevelopment Authority said that MVP Aero made the announcement of their decision to locate at Brunswick Landing at the U.S. Sport Aviation Expo in Sebring, Florida last week.

The article credits Paul Richards, MVP’s Director of Business Development, as saying the company picked the former Navy base because of its advanced airport facilities near the Androscoggin River and Casco Bay for testing the flying boat; local expertise both in composites and boatbuilding; and the ability to build the full prototype in the TechPlace building.

Apparently, this location has been decided on as the building location for the prototype but no firm decision has yet been made as to the location of the actual production facility.

The article cites Richards as saying the company estimates that will take about 18 months to two years to develop the prototype. The aircraft that has been seen at EAA AirVenture in 2014 and 2015 is not a prototype, it is an engineering mockup.

(Image from file)

FMI: Original source   www.mvp.aero

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC