First Production VH-71 To Start Final Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Jan 12, 2009

First Production VH-71 To Start Final Production Phase

Integration Of Helo's Systems Begins At Owego Facility

The first Lockheed Martin pilot production VH-71 presidential helicopter to begin the integration and final production process arrived at the company's Owego, NY, facility Friday. Six of nine helicopters that make up the first phase of the VH-71 presidential helicopter program are now in the US, including four test-configured aircraft and two production aircraft.

"The arrival of this production aircraft to the Lockheed Martin facility here is a great start to the new year, after a very successful year for the program in 2008," said Jeff Bantle, Lockheed Martin VH-71 vice president and general manager. "Four years into the program, six aircraft are in the US undergoing flight testing or integration, systems integration laboratories are fully functional and the helicopter is meeting or exceeding all key performance parameters."

The helicopter, pilot production aircraft number three (PP-3), will now be integrated with mission systems, outfitted with a cabin interior, painted in presidential livery and flight tested before being delivered to the US Navy and ultimately to Marine Helicopter Squadron One.

Two VH-71 test aircraft are also at the facility, undergoing mission systems installation. At Naval Air Station Patuxent River, MD two additional test helicopters are conducting flight testing, while production aircraft PP-1, which joined the test program November 24, is conducting ground vibration testing, after which it will also be flown to Lockheed Martin's Owego facility for integration and completion.

The VH-71 program is divided into two phases, or increments. Increment One provides five helicopters on an accelerated schedule with improved capabilities over the current fleet. Increment Two will provide a fleet of 23 helicopters that complete the White House requirements for a command and control platform.

FMI: www.lockheedmartin.com/

Advertisement

More News

Aero-News: Quote of the Day (12.11.25)

"The owners envisioned something modern and distinctive, yet deeply meaningful. We collaborated closely to refine the flag design so it complemented the aircraft’s contours w>[...]

ANN's Daily Aero-Term (12.11.25): Nonradar Arrival

Nonradar Arrival An aircraft arriving at an airport without radar service or at an airport served by a radar facility and radar contact has not been established or has been termina>[...]

Classic Aero-TV: David Uhl and the Lofty Art of Aircraft Portraiture

From 2022 (YouTube Edition): Still Life with Verve David Uhl was born into a family of engineers and artists—a backdrop conducive to his gleaning a keen appreciation for the >[...]

Airborne-NextGen 12.09.25: Amazon Crash, China Rocket Accident, UAV Black Hawk

Also: Electra Goes Military, Miami Air Taxi, Hypersonics Lab, MagniX HeliStrom Amazon’s Prime Air drones are back in the spotlight after one of its newest MK30 delivery drone>[...]

Airborne 12.05.25: Thunderbird Ejects, Lost Air india 737, Dynon Update

Also: Trailblazing Aviator Betty Stewart, Wind Farm Scrutiny, Chatham Ban Overturned, Airbus Shares Dive A Thunderbird pilot, ID'ed alternately as Thunderbird 5 or Thunderbird 6, (>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC