VEM Receives Airbus Certification For A310 Rudder Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-Unlimited-09.02.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Tue, Dec 30, 2008

VEM Receives Airbus Certification For A310 Rudder Repairs

Assemblies Susceptible To Delamination

VEM Maintenance & Engineering has been chosen by Airbus as its only Authorized Repair Center in Latin America to overhaul the composite rudder assemblies of the Airbus A310 fleet.

The Brazilian company notes it already holds all major certifications in both airplane and component maintenance.

Airbus says VEM's technical capacity was the determining factor for the company to be chosen and certified. Another positive point was VEM's "White Room" (a chamber with environmental control: temperature, relative humidity, and suspended particles), which can hold the rudder of the A310, and meets all of Airbus' control standards.

The course was held from October 20-31 at Airbus' facilities in Stade, Germany. VEM sent a team of three members (technicians/engineers), from the Composite Structures Area, to take the training and then to multiply it within the company.

The course focused on theoretical and practical aspects of the construction and repair concept of the A310 rudder, including key parts of the process, such as delamination and disbonds caused by the moisture entrapment... defects that reduce the structural integrity of these components (shown above).

"Besides the importance of this certification for VEM's portfolio of services, it was also important for the growth of the team," comments Structural Engineer Rodrigo Gaya. "Airbus presented to us the techniques developed over the past five years, so that the same quality assured by Airbus is assured by its Authorized Repair Centers. It was gratifying to hear commented by Airbus' technical team and by Project Manager Olaf Rokitta that VEM obtained the best results in the entire history of this training, which took place on the ninth day of testing."

FMI: www.vem.aero/, www.airbus.com

Advertisement

More News

Airborne 08.29.25: G800 Delivery, Alaska F-35 Crash, USCG-RCAF Medevac

Also: New SAF, Korean Air Buys 103 Boeings, Maryland SP Helo Rescue, OK AWOS Update Gulfstream Aerospace Corporation announced its first customer delivery of the all-new Gulfstream>[...]

Aero-News: Quote of the Day (08.30.25)

"This is just an absolute win win win. If there is a rejected takeoff we now have the confidence that the arrestor system will ensure passenger and crew safety." Source: FAA Admini>[...]

ANN's Daily Aero-Term (08.30.25): Low Approach

Low Approach An approach over an airport or runway following an instrument approach or a VFR approach including the go-around maneuver where the pilot intentionally does not make c>[...]

ANN's Daily Aero-Linx (08.30.25)

Aero Linx: Historic Aircraft Association (HAA) The Historic Aircraft Association (HAA) was founded in 1979 with the aim of furthering the safe flying of historic aircraft in the UK>[...]

NTSB Final Report: Excalibur Excalibur

While Flying About 1,500 Ft Above Ground Level, A Large Bird Struck The Right Side Of The Airplane Analysis: The pilot reported that while flying about 1,500 ft above ground level,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC