Ultimate Load Testing On Gulfstream G500 Validates Structural Integrity | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 18, 2016

Ultimate Load Testing On Gulfstream G500 Validates Structural Integrity

Stressed To 150 Percent Load Limit, Fulfilling Certification Requirement

Gulfstream has completed ultimate load testing for its new Gulfstream G500. Ultimate load represents 150 percent of limit load and is equivalent to a 1.5 safety factor specified by the FAA and EASA. Limit load is the maximum level that an aircraft should experience once during its service life. Completion of the full-scale aircraft ultimate test fulfills the certification requirements for both the FAA and EASA.

Carried out over five months, the testing focused on the aircraft’s fuselage, wing, vertical and horizontal stabilizers and control surfaces. It involved eight primary test conditions, including wing up and down bending, horizontal up and down bending and wing torsion.

More than 6,000 channels of instrumentation, including load cells, strain gages, displacement transducers and instrumented links/pins, were used to monitor the test article’s structural response. Cameras inside the wing, empennage and fuselage allowed engineers and technicians real-time insight into the structure’s behavior.

“This is a significant accomplishment in development of the G500,” said Mark Burns, president, Gulfstream. “The successful completion of these tests confirms the airframe’s solid construction, fulfills certification requirements and clears the way for us to proceed with additional testing.”

Gulfstream will now conduct an additional company test, applying increasingly higher loads to determine the structural test article’s destruction point. Destructive testing of aircraft components is important to demonstrate and refine Gulfstream’s engineering models, designs and analysis methods.

Later this year, Gulfstream will begin a multi-year fatigue program for the G500 that will simulate three lifetimes of airframe operation.

(Source: Gulfstream new release. Image from file)

FMI: www.gulfstream.com

 


Advertisement

More News

NTSB Prelim: Sikorsky UH60 Sikorsky UH-60

Sikorsky UH-60 Black Hawk Helicopter Collided With An Unregistered DJI Mavic 3T Unmanned Aerial Vehicle On July 7, 2025, about 1557 central daylight time, an unregistered Sikorsky >[...]

Aero-News: Quote of the Day (11.13.25)

“After considering the measures taken, minimum liquidity covenants in the Company's current debt obligations and cash flows to maintain current operational obligations requir>[...]

ANN's Daily Aero-Term (11.13.25): Ground Clutter

Ground Clutter A pattern produced on the radar scope by ground returns which may degrade other radar returns in the affected area. The effect of ground clutter is minimized by the >[...]

ANN's Daily Aero-Linx (11.13.25)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC