Astronauts Complete Second STS-119 Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-Unlimited-09.02.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Sun, Mar 22, 2009

Astronauts Complete Second STS-119 Spacewalk

Wrong-Way Pin Leads To Complications

Astronauts Steve Swanson and Joseph Acaba ended the second spacewalk of the STS-119 mission to the International Space Station at 7:21 pm EDT Saturday. They prepared a worksite so the STS-127 spacewalkers can more easily change out the Port 6 truss batteries later this year.

On the Japanese Kibo laboratory, Swanson and Acaba installed a second Global Positioning Satellite antenna that will be used for the planned rendezvous of the Japanese HTV cargo ship in September. They also photographed areas of radiator panels extended from the Port 1 and Starboard 1 trusses and reconfigured connectors at a patch panel on the Zenith 1 truss that power Control Moment Gyroscopes.

There was one rather significant glitch during the spacewalk... and it was due to human error. The Associated Press reports Acaba accidentally inserted a pin upside down, jamming the deployment of an equipment storage platform outside Kibo.

After struggling with the balky pin, the spacewalkers tied off the unpressurized cargo carrier attachment system (UCCAS) in hopes engineers on the ground will determine a way to free the stuck pin during Monday's third and final spacewalk.

"Even with it being installed in the opposite location, he just drew a card of bad luck ... if it had been rotated just a little bit more or maybe a little bit less, it might have cleared just fine," Glenda Laws-Brown, STS-119 Lead Extravehicular Activity Officer, said Saturday evening.

"Some days you're lucky, and some days you're less lucky," she added, also noting there is no "up" and "down" in space... which makes the error easy to understand. Nevertheless, time spent trying to solve the pin issue meant other items on the agenda were bumped to Monday's excursion.

A second, more dramatic -- but ultimately less significant -- problem occured near the end of the six hour, 30-minute spacewalk. Due to Acaba's and Swanson's movements at the end of the station's truss assembly, the onboard gyros that maintain the station's attitude in orbit overheated, triggering an alarm.

The problem was "nothing to worry about," Mission Control stated, and the docked shuttle Discovery briefly assumed control of maintaining the station's orbital attitude while the gyroscopes cooled.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Airborne 08.29.25: G800 Delivery, Alaska F-35 Crash, USCG-RCAF Medevac

Also: New SAF, Korean Air Buys 103 Boeings, Maryland SP Helo Rescue, OK AWOS Update Gulfstream Aerospace Corporation announced its first customer delivery of the all-new Gulfstream>[...]

Aero-News: Quote of the Day (08.30.25)

"This is just an absolute win win win. If there is a rejected takeoff we now have the confidence that the arrestor system will ensure passenger and crew safety." Source: FAA Admini>[...]

ANN's Daily Aero-Term (08.30.25): Low Approach

Low Approach An approach over an airport or runway following an instrument approach or a VFR approach including the go-around maneuver where the pilot intentionally does not make c>[...]

ANN's Daily Aero-Linx (08.30.25)

Aero Linx: Historic Aircraft Association (HAA) The Historic Aircraft Association (HAA) was founded in 1979 with the aim of furthering the safe flying of historic aircraft in the UK>[...]

NTSB Final Report: Excalibur Excalibur

While Flying About 1,500 Ft Above Ground Level, A Large Bird Struck The Right Side Of The Airplane Analysis: The pilot reported that while flying about 1,500 ft above ground level,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC