Boeing Awarded Contract For 18 New AH-64D Helos | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Apr 10, 2007

Boeing Awarded Contract For 18 New AH-64D Helos

Longbows Will Be Assembled In Mesa, AZ

This week, Boeing and the US Army signed a $276.4 million contact for 18 new AH-64D Apache Longbow multi-role combat helicopters. The contract raises to 45 the number of new-build Apache Longbows on order with the US Army.

Boeing will begin delivery of these new-build helicopters in mid-2009 at its manufacturing facility in Mesa, AZ where Apaches have been built since the program's inception.

"The combat-proven Apache Longbow continues to support our warfighters and the battlefield commander's requirements across the full spectrum of operations," said David Almond, Boeing Block II Apache program manager. "We remain committed to producing the most superior attack helicopter in the world -- a helicopter that our soldiers can count on each and every time."

The US Army uses the Apache Longbow to fulfill attack helicopter and reconnaissance requirements. Featuring fully integrated avionics and weapons, plus state-of-the-art digital communications capabilities, the Apache Longbow can rapidly detect, classify, prioritize and engage stationary and moving opposition targets at standoff ranges in nearly all weather environments.

The new Army Apache Longbow aircraft, to be built in the Block II configuration, are in addition to the 501 remanufactured AH-64D Apache Longbows built between 1997 and 2006 under two five-year, multi-year contracts. The Army also recently contracted for the remanufacture of 96 AH-64A Apaches into AH-64Ds.

FMI: www.boeing.com/ids

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC