NASA Releases Details Of Second LDSD Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Thu, Jun 11, 2015

NASA Releases Details Of Second LDSD Test

Two Decelerator Technologies Evaluated During Flight

Engineers are poring over the data following the second experimental landing technology test of NASA's Low-Density Supersonic Decelerator (LDSD) project. The saucer-shaped LDSD craft splashed down at 11:49 a.m. HST (5:49 p.m. EDT) Monday in the Pacific Ocean off the west coast of the Hawaiian island of Kauai.

During this flight, the project team tested two decelerator technologies that could enable larger payloads to land safely on the surface of Mars, and allow access to more of the planet's surface by assisting landings at higher-altitude sites.

"Developing and demonstrating entry, descent and landing technologies such as supersonic decelerators is critical to enabling our journey to Mars," said Steve Jurczyk, associate administrator for the Space Technology Mission Directorate at NASA Headquarters in Washington. "The technologies tested on LDSD are giving us data and insight into the capabilities we’ll need to land more mass than we currently can on Mars, which will enable more capable robotic missions, as well as human precursor missions to the Red Planet."

A high-altitude balloon carrying the LDSD test vehicle launched at 7:45 a.m. from the U.S. Navy's Pacific Missile Range Facility (PMRF) on Kauai.  As planned, at 11:35 a.m., the vehicle separated from the balloon at about 120,000 feet above the ocean. An onboard rocket motor then took the vehicle to 180,000 feet, where the first braking technology, the Supersonic Inflatable Aerodynamic Decelerator (SIAD), deployed at about Mach 3 at 11:37 a.m.

Fourteen seconds after SIAD inflation, the test vehicle's parachute was released into the supersonic slipstream, according to plan. Preliminary analysis of imagery and other data received during the test indicates the Supersonic Ringsail parachute deployed. This 100-foot-wide parachute is the largest supersonic parachute ever flown. It has more than double the area of the parachute used for the Mars Science Laboratory mission that carried the Curiosity rover to the surface of Mars. The chute began to generate large amounts of drag and a tear appeared in the canopy at about the time it was fully inflated.

"Early indications are that we got what we came for, new and actionable data on our parachute design," said Mark Adler, project manager for LDSD at NASA's Jet Propulsion Laboratory (JPL) in Pasadena, California. "At present, our data is in the form of low-resolution video and some other nuggets of data which were downlinked in real-time. But this will soon change when our test vehicle makes port, and we have the opportunity to inspect the ultra-high resolution, high-speed imagery and other comprehensive information carried in the memory cards on board our saucer."

Monday’s flight test was the second for the project. During the first flight on June 28, 2014, the main goal was to demonstrate and operate the vehicle through its entire mission. That flight also carried the two LDSD braking technologies, and the SIAD worked perfectly during the first test. However, the supersonic parachute did not inflate as designed. With the data from last year's test, the LDSD team developed a new formula for this year's chute, making it stronger and more curved into its top to help it survive the initial shock of supersonic wind.

"The physics involved with LDSD is so cutting-edge we learn something profound every time we test," said Ian Clark, principal investigator for LDSD at JPL. "Going into this year's flight, I wanted to see that the parachute opened further than it did last year before it began to rupture. The limited data set we have at present indicates we may not only have gone well down the road to full inflation, but we may have achieved it.

“We also saw another successful inflation of our 20-ft SIAD and another successful deployment and inflation of our supersonic ballute (an inflatable drag device that extracts the parachute). Both of those devices have now had two great flights, and we have matured them to the point where they can be used, with confidence, on future missions,” Clark added. “We’re not just pushing the envelope. We flew a 7,000-pound test vehicle right through it."

NASA expects to make high-resolution imagery and comprehensive data from the test available to the public in about two weeks.

(Images provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

Airborne 05.28.24: Jump Plane Down, Starship's 4th, Vision Jet Problems

Also: uAvionix AV-Link, F-16 Viper Demo, TN National Guard, 'Staff the Towers' A Saturday afternoon jump run, originating from SkyDive Kansas City, went bad when it was reported th>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC