NextGen Carrier Contract Awarded | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, May 25, 2004

NextGen Carrier Contract Awarded

Northrop Grumman Will Build CVN-21

The Navy and Northrop Grumman Newport News (NGNN) have successfully negotiated the construction preparation (CP) contract for CVN 21, the next generation aircraft carrier.

CVN 21 will be the centerpiece of tomorrow’s carrier strike groups and a contributor to the future expeditionary strike force as envisioned in “Sea Power 21.”

Advance procurement and advance construction of components and associated design efforts in support of the anticipated Fiscal 2007 ship procurement for CVN 21 are provided for under the contract.

The CVN 21 CP contract is a three-year, cost type contract for advanced procurement of material, design and engineering, and advance construction of CVN 21.

The total value of the contract is $1.4 billion. This contract includes cost, schedule and performance incentives designed to ensure CVN 21 requirements are met at an affordable price.

Speaking about the contract, John Young, assistant secretary of the Navy for research, development and acquisition said, “The contract agreement reached by the Navy and the Northrop Grumman Newport News (NGNN)team is an important step in the course charted for development of the next generation aircraft carrier. This contract provides for the continued design and development of the next generation aircraft carrier, as well as incentives for NGNN and the Navy team to work together to develop and manage the design of the CVN 21.

The contract structure has a portfolio of incentives that focuses on obtaining the most innovative ship design that will meet the program’s performance goals, while emphasizing timely delivery and control of all costs – material, labor, facilities, overhead and construction. This CP contract is a win-win for both the Navy and NGNN, and is a significant accomplishment for the CVN 21 program. The contract establishes key metrics for NGNN and the Navy, and provides the tools necessary for the Navy to work with NGNN to manage the design of CVN 21."

FMI: www.defenselink.mil

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC