Associated Air Center Delivers First Airbus A330-200 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Mon, Oct 06, 2014

Associated Air Center Delivers First Airbus A330-200

Airplane Represents Fifth Overall Wide-Body Completion Project

Associated Air Center (AAC), has delivered its first green Airbus A330-200 VVIP wide-body aircraft completion project for a prominent customer. The project included a full cabin (nose-to-tail) customization equipped with high speed data, high definition In-Flight Entertainment (IFE), a comprehensive sound insulation package, stand-up shower, full cooking and food preparation, forward and aft galleys and complete interior zonal drier and humidification system. The end customer took delivery of the aircraft from AAC’s Dallas Hangar and departed via Love Field on September 23.

In its more than 66 years of operations, AAC has performed dozens of narrow-body projects as well as four wide-body Boeing 747 and 767 projects. This was the first Airbus wide-body project completed by the company and the fifth overall. AAC’s re-emergence into the wide-body VVIP market has been strong for the past three years and currently the company is working on both a 747-8 program and its first 787 completion in Dallas. Even with the two wide-body aircraft in its facilities, AAC has plenty of capacity to take on additional projects, including narrow and wide-body completions as well as maintenance, repair and overhaul services.

“The A330-200 was a very large and complex completion program,” said James Colleary, President of AAC. “As part of the process, we added staff and expanded our current facilities to accommodate this and future wide-bodies. There were many engineering challenges and customer revisions throughout the process but our employees delivered and we have returned a safe and beautiful aircraft to a very happy customer.”

FMI: http://associated.aero/

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC