Airbus A350 XWB Program Adds Magellan Aerospace | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 12, 2013

Airbus A350 XWB Program Adds Magellan Aerospace

Selected To Machine And Assemble Structural Components New Airplane

An agreement had been reached between Airbus S.A.S. and Magellan Aerospace securing a major work package on the Airbus A350 XWB. The package, which is an addition to other supply contracts Magellan Aerospace has on the A350XWB, consists of a series of machined and assembled structural components for the fuselage structure in this aircraft which supports the cabin storage bins and aircraft systems and is worth approximately $45 million dollars over the next 4 years.

Production will utilize existing and new capacity at Magellan's facilities in the UK in Wrexham, Chalfont and Greyabbey.  To support this program Magellan will invest in a range of new high technology machines to optimize efficiency and value to the customer. These investments demonstrate Magellan's commitment to developing world class manufacturing facilities focused on core competencies.

Mr.  Jim Butyniec, President and Chief Executive Officer of Magellan discussed the strategic importance of participation on the A350 XWB program and Magellan's continued drive to secure major work packages on future aircraft for Airbus and Boeing programs.  He commented, "This new package, together with existing A350 XWB work consolidates Magellan's strong position on this exciting new Airbus program"

(Image provided by Airbus)

FMI: www.malaero.com

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC