Testing On First Fully-Conforming Adam A700 Now Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, May 23, 2007

Testing On First Fully-Conforming Adam A700 Now Underway

Focus Currently On Systems Configuration, Flight Controls

Adam Aircraft told ANN Wednesday of several important milestones for the company's A700 AdamJet certification program. The first fully conforming A700, Serial Number 003, joined the flight program with its first flight on April 9, 2007. Since first flight, testing has focused on the evaluation of the production configuration of flight controls, landing gear system, avionics, and data acquisition system used for flight testing.

"Since Serial Number 003 entered the flight program, the aircraft has handled very well and all systems are performing as expected," stated Adam Aircraft Flight Test Pilot Jeff Peer. "We are working on air speed calibration and stability and control effectiveness with different configurations throughout the flight envelope. The three-screen Avidyne display has been particularly impressive in providing a clear overview of the aircraft’s performance, perspectives, and the aircraft is very reliable out of the box."

In addition to Serial Number 003, two nonconforming prototypes have completed more than 989 hours of risk-reduction testing. "We learned a lot from the two prototypes and we are very pleased with Jet 003."

Adam Aircraft reports S/N 003's all-carbon fiber design has met or exceeded its structural design parameters. The aircraft has completed Ground Vibration Testing (GVT), which is a necessary step in clearing the aircraft for its full-speed operating envelope, including a maximum cruise speed of 340 KTAS and maximum operating ceiling of 41,000 feet.

In support of flight test, Adam Aircraft is also conducting full-scale static testing on several test articles and has successfully completed more than 75 percent of the company tests. Static testing for FAA requirements is currently 20 percent complete and will conclude in 2007.

The fuselage, wing, and tail for Jet 004 have been mated, and the aircraft will join the test program this summer, followed by Jet 005 later this year. The last aircraft used in the certification program, Jet 006, will be built to support the Functional and Reliability (F&R) tests at the end of the flight test program.

Following the conclusion of F&R tests, Adam expects to obtain its A700 Type Certificate, with deliveries beginning in 2008. The A700 will be added to the Adam Aircraft Production Certificate (PC) already in place for its facilities in Englewood and Pueblo, CO and Ogden, UT in support of production of the A500 piston twin aircraft, which shares many of its components with the AdamJet.

FMI: www.adamaircraft.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC