Endeavour Launch Scrubbed For Friday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Apr 29, 2011

Endeavour Launch Scrubbed For Friday

APU Heaters Malfunctioned About Three Hours Before Launch

ANN Realtime Update 1410 EDT 04.29.2011: Shuttle launch director Mike Leinbach stated that Endeavour's launch will be no earlier than Monday at 1433 EDT. Engineers need that time to troubleshoot an issue that resulted in Friday's launch scrub.


Lightning Strikes Thursday Near Endeavour. Weather has not been associated with Friday's launch scrub.

During today's countdown, engineers detected a failure in one of two heater circuits associated with Auxiliary Power Unit (APU) 1. Heaters are required to keep the APUs' hydrazine from freezing on orbit. Attempts to activate the heater were not successful and engineers now believe the problem might be associated with a Load Control Assembly, which is a switchbox, located in the aft end of Endeavour, or an electrical short in the wires leading into or out of the switchbox.

Endeavour's external tank will be drained, technicians will enter Endeavour's aft compartment overnight and by tomorrow afternoon, will put in a platform to gain access to the avionics bay where the Load Control Assembly is located. Once there, they will assess whether they need to remove and replace the switchbox, or fix an electrical wiring short.

Because of this, Leinbach said there will be a minimum 72-hour scrub turnaround.

Engineers and managers will meet Friday afternoon to further refine their troubleshooting plan. NASA has scheduled a news conference at 1600 to discuss today's scrub and the plan.

BREAKING NEWS Update: 1330 EDT. Shuttle Endeavour's launch now no earlier than Monday at 1433 EDT. A news conference is scheduled for 1600 Friday.

Original Story: 4.29.2011 1340 EDT: The launch of space shuttle Endeavour has been scrubbed for at least 48 hours. NASA announced the scrub via Twitter about 1230 EDT. They cite problems with two of the heaters associated with the spacecraft's Auxiliary Power Unit (APU) 1 as the reason for postponing the launch.

The shuttles three APUs provide hydraulic power to steer the shuttle's aerosurfaces during ascent and entry.

Additional information will be posted as it becomes available.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC