AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Columbus day Holiday

Airborne-Unlimited-10.15.24

Airborne-NextGen-10.16.24

Airborne-FlightTraining-10.10.24

Airborne-Unlimited-10.18.24

Sat, Jan 01, 2022

AD: The Boeing Company Airplanes

AD 2021-24-02 Prompted By Reports Indicating Incidents Of Wires Chafing

The FAA is adopting a new airworthiness directive (AD) for all The Boeing Company Model MD-11 and MD-11F airplanes.

This AD was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. This AD requires, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective February 1, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all The Boeing Company Model MD-11 and MD-11F airplanes.

The NPRM published in the Federal Register on August 18, 2021 (86 FR 46167). The NPRM was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. In the NPRM, the FAA proposed to  require, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address wire chafing and arcing on the panel, which could cause damage to equipment, and result in loss of electrical power and a possible in-flight fire.

FMI: www.regulations.gov

Advertisement

More News

Textron Proposes New Contract to Striking Machinists

Presented Just Three Weeks After its “Best and Final” Offer Three weeks ago, Textron Aviation presented its “best and final” offer to its striking machinist>[...]

NTSB Prelim: Cirrus Design Corp SR22

After The Airplane Exited The Left Side Of The Runway It Continued Into A Tree... On September 25, 2024, at 1833 central daylight time, a Cirrus SR22 airplane, N565CP, was substant>[...]

Aero-News: Quote of the Day (10.18.24)

“Our focus this decade is to win the NASA Commercial LEO Destination (CLD) contract and build the successor to the International Space Station. To achieve this, we will first>[...]

ANN's Daily Aero-Term (10.18.24): Air Carrier District Office

Air Carrier District Office An FAA field office serving an assigned geographical area, staffed with Flight Standards personnel serving the aviation industry and the general public >[...]

ANN's Daily Aero-Linx (10.18.24)

Aero Linx: The Vertical Flight Society (VFS) The Vertical Flight Society, formerly the American Helicopter Society (AHS), is the non-profit technical society for the advancement of>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC