Boeing Delivers 300th Army Apache Longbow | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Wed, Jun 25, 2003

Boeing Delivers 300th Army Apache Longbow

Reaching a goal of 300 in anything can be quite an accomplishment. The 300th AH-64D Apache Longbow, the world's most advanced, most capable multi-role combat helicopter, was delivered to the Army on May 22 at the Boeing Mesa, Ariz., facility where the Apache is built.

"Like all the Apache Longbow's that have preceded it, number 300 is a testimony to our great ongoing partnership with the U.S. Army's Apache Project office," said Al Winn, Apache Programs vice president. "We are continuously looking at ways to address our customer's evolving needs, while meeting delivery schedules and keeping the Apache a world leader."

The U.S. Army has designated the Apache Longbow as a key member of its Objective Force for the future. The latest helicopters, including number 300, are in what is known as the "Block II" configuration, meaning these aircraft contain a number of enhancements which are key to improving situational awareness and move the program ahead toward Apache's role in the digital Army of the future.

"These upgrades - and those proposed for future aircraft enhancement - will help the Apache retain its leading edge capabilities," continued Winn. "They include: the addition of a digital map to improve navigation; a high-frequency radio to improve communications; and an improved data modem to enable Joint Variable Message Format (JVMF) messaging, allowing the Apache to communicate within the Tactical Internet."

Boeing is delivering 269 AH-64Ds to the U.S. Army through the year 2006 under the second of two multi-year contracts. The first contract, Multi-Year I, covered 232 Apache Longbows for a total of 501.

FMI: www.boeing.com

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC