Alenia Aermacchi Announces 1st Flight Of ITAF T-346A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Apr 06, 2011

Alenia Aermacchi Announces 1st Flight Of ITAF T-346A

Trainer Built For The Italian Air Force

The first M-346 aircraft produced for the Italian Air Force (ITAF) had a successful first flight last Thursday. The ITAF has designated the plane as the T-346A.

"The first flight of the T-346A, soon to enter service with our country's Air Force, is an important milestone for the M-346 program, a milestone reached through the dedication of the entire work force of the Venegono plant," said Giuseppe Giordo, CEO of Alenia Aeronautica overseeing the Aeronautics Sector of Finmeccanica Group.

Flown by Chief Test Pilot Quirino Bucci, the aircraft took off at 1600 from Venegono, the home airfield of Alenia Aermacchi, a Finmeccanica company controlled by Alenia Aeronautica. The flight lasted 40 minutes and the T-346A reached a maximum altitude of 15,000 ft., covering the planned flight envelope in terms of speed, angle of attack and load factor. The flight also included manoeuvres to assess aeromechanical handling of the aircraft and systems functionality.

After landing, Captain Bucci expressed appreciation for the aircraft. "Once again, the aircraft demonstrated its excellent characteristics in terms of handling, energy and man-machine interface, all crucial points in training future pilots to fly new generation combat aircraft."

The ITAF T-346A is the first M-346 series production aircraft completed. The Alenia Aermacchi site in Venegono now operates a leading-edge, highly-automated production line capable of delivering up to 48 aircraft per year with competitive cost and high quality in order to meet the highest program requirements. The remaining aircraft for the Italian Air Force are already being built on this new assembly line, and production of the 12 aircraft ordered by the Singapore Air Force are also underway.

Alenia says the Air Forces of several nations have expressed interest in this aircraft, which meets the latest training requirement of the new generation aircraft such as the F-22, F-35 and the Eurofighter.

FMI: www.alenia-aeronautica.it/eng/Pages/Home.aspx

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC