Atlas V Rocket Assembled for Starliner Launch to ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Jul 12, 2021

Atlas V Rocket Assembled for Starliner Launch to ISS

Technicians Will Soon Power The Atlas V To Test Flight Controls

United Launch Alliance’s (ULA) Atlas V rocket has been assembled in preparation for Boeing’s much-delayed Orbital Flight Test-2 (OFT-2) launch to the International Space Station as part of NASA’s Commercial Crew Program.

Engineers in ULA’s Vertical Integration Facility (VIF) used large cranes to assemble the stages of the rocket in an upright position on its mobile launch platform, which will carry the Atlas V and Starliner from the VIF to the pad for launch.

To verify the rocket is ready to launch, technicians will soon power the Atlas V to test flight controls, check the engine steering profiles, and conduct a combined systems test.

The 172-foot-tall rocket will be fully completed when the Starliner is mounted aboard the Atlas V. A ULA payload transporter will move the capsule from Boeing’s Commercial Crew and Cargo Processing Facility (C3PF) at the Kennedy Space Center to the nearby VIF for attachment.

The Atlas V will propel Starliner off the pad on 1.6 million pounds of thrust on its second uncrewed flight test from Space Launch Complex-41 at Cape Canaveral Space Force Station in Florida no earlier than July 30.

As Boeing’s second uncrewed flight for NASA’s Commercial Crew Program, OFT-2 will serve as an end-to-end flight test to prove the Atlas V rocket and Starliner are ready for regular missions launching astronauts to and from the space station.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC