SpaceX Moving Toward Next Starship Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Aug 28, 2024

SpaceX Moving Toward Next Starship Launch

Awaiting FAA Certification For Fifth Test Flight

The next launch of SpaceX’s Starship Integrated Flight Test 5 (IFT-5) was originally announced as potentially happening in early August, as posted in July by Elon Musk on X (formerly Twitter).

That schedule has obviously slipped a bit, and is now slated for the first week of September as SpaceX is awaiting the expected FAA certification for the launch.

The launch has already been certified by the Federal Communications Commission (FCC). Given the demonstrated progressive success of the last two launches there should be no reason to think the FAA is doing anything other than its usual committee-think in approving the mission.

The two stage Starship launch vehicle is the most powerful rocket ever built and consists of the 235-foot tall first-stage Super Heavy booster and the 165-foot tall second-stage Starship, referred to simply as Ship. The upcoming flight will launch from SpaceX’s Starbase near Brownsville, Texas, and will feature the first time Super Heavy is planned to execute a pinpoint landing back on its launch pad, assisted by the arms of the launch tower. Both stages are designed for reuse so a return landing of Ship will be incorporated into a future flight.

The previous four test flights have performed successively better on each flight. Starship is designed for launching missions to Earth orbit, the Moon, and Mars.

FMI:  www.spacex.com/

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC