Santa To Help Test New KSC Control Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Dec 23, 2003

Santa To Help Test New KSC Control Tower

On Christmas Eve, when Santa Claus slips into NASA-Kennedy Space Center airspace under cover of darkness, a radar controller at the Shuttle Landing Facility (SLF) will be following his every move from a brand new, state-of-the-art traffic control tower.

 "We've been in contact with Santa, although for security reasons I can't elaborate," said Ron Feile, lead air traffic controller with Space Gateway Services (SGS). "Santa knows about the control tower, and he's very pleased that he can help us give it a shakedown."

SLF employees look forward to working in the new facility. It replaces a control tower that has been in use since 1987. Located just south of the SLF's midpoint, the old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower are hindered by the eight-billion candlepower xenon lights that illuminate the runway.

Built atop an existing mound, the new control tower rises nearly 100 feet over the midpoint of the runway, giving controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County.

The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology.

From a weather station located in a wooded area east of the runway, KSC weather is also monitored 24 hours a day. From this area, the SLF is not even visible. When the new tower opens, those who monitor the weather will move in first, giving up their remote station in favor of the new, high-tech facility.

Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.

"The new building is a great improvement," Feile said. "We look forward to testing it out on Christmas Eve during Santa's landing."

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC