Launch Vehicle for Amazonas 5 Arrives At Baikonur | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Aug 24, 2017

Launch Vehicle for Amazonas 5 Arrives At Baikonur

Will Boost An SSL Satellite Into Orbit In September

The ILS Proton Launch Vehicle hardware for the Amazonas 5 launch arrived at the launch site in Baikonur via train on August 18th. The LV hardware includes the Proton, Breeze M, Payload Fairing, and Ascent Unit. Offloading into Halls 101 and 111 is now in progress. Launch is scheduled for September from Pad 39.

The satellite will be used for both video content delivery and internet connectivity, among other services, in Latin America. The launch of Amazonas 5 will be the 95th ILS Proton mission and the 30th with a Space Systems Loral (SSL) satellite. Amazonas 5, based on the SSL 1300 platform, will be located at 61°W longitude and is designed to provide service for 15 years or more.

The Proton M launch vehicle and the Breeze M Upper Stage are designed and produced at Khrunichev Space Center of Moscow, one of the core industry enterprises under the Russian Space Agency, ROSCOSMOS.

Proton marked its milestone 100th Proton M flight on August 16th, the 414th launch of the Proton rocket since its maiden flight in 1965.

(Source: International Launch Service news release)

FMI: www.ilslaunch.com

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC