Pad 39A Conversion Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Nov 24, 2014

Pad 39A Conversion Underway

SpaceX Modifying The Historic Site For Its Falcon Heavy Rocket

Modifications of launch Pad 39A at the Kennedy Space Center are underway, as SpaceX prepares for the first launch of a Falcon Heavy rocket from the historic facility.

The pad was mothballed by NASA and the Kennedy Space Center after the shuttle program ended in 2011. It was one of the last visible reminders of that era of space travel.

With all SLS launches planned for pad 39B, NASA awarded the right to repurpose 39A to SpaceX, and the private company hopes to be able to launch the first of its new heavy rockets next summer.

NASASpaceflight.com reports that most of the work currently underway seems to be on the perimeter of the launch site, and a SpaceX says that the pad will retain much of its current appearance. For Instance, according to SpaceX spokesman John Taylor, the Rotating Service Structure (RSS) that had been an integral part of the payload installation process for the Shuttle will remain in place. There had been speculation that SpaceX would also add to the Fixed Service Structure (FSS) at the pad, but Taylor said that for now, it will remain at its current height, but with some structural reinforcements.

A date of July 1, 2015 has been set for a "Wet Dress Rehearsal" (WDR) for the Falcon Heavy to validate the rocket and launch systems. The next steps would be a Static Fire test and a Launch Readiness Review before the actual first flight test is conducted.

(NASA image of Discovery at Pad 39A)

FMI: www.spacex.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC