First Major Assembly Delivered For Sikorsky CH-53K Heavy Lift Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Sep 10, 2010

First Major Assembly Delivered For Sikorsky CH-53K Heavy Lift Helicopter

GKN Aerospace Employs Latest Design And Manufacturing Techniques

The first major structural assembly for the CH-53K heavy lift helicopter has been delivered by GKN Aerospace to Sikorsky Aircraft Corp. The CH-53K helicopter's aft transition fuselage section measures approximately 20 feet long by 9 feet wide and 9 feet high and features an advanced hybrid composite, aluminium and titanium structure covered with external composite skins.

The work is being undertaken as part of a multi-year System Design & Development (SDD) contract in which GKN Aerospace was accorded full design authority and manufacturing responsibility for the CH-53K helicopter aft transition fuselage section, cargo ramp, and overhead door structural assemblies. GKN Aerospace was awarded the contract in 2007 and will deliver seven development ship sets to Sikorsky by 2012.

Structural design was carried out by the GKN Aerospace Engineering Development Center in Nashville, TN, while manufacturing takes place at the Company's plant in St. Louis, MO. Full production of 156 ship sets is expected to commence in 2013 and continue through 2022.


Sikorsky Image

To meet demanding CH-53K helicopter program weight, durability and affordability objectives, GKN Aerospace is employing the latest design and manufacturing technologies including automated fiber placement (AFP), automated trim and drill and digital inspection. In total, more than 1,000 separate metallic and composite detailed parts per aircraft are manufactured and assembled by the GKN Aerospace team.

FMI: www.gknaerospace.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC