Navy EA-6B Fighting Fatigue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-03.10.25

Airborne-NextGen-03.11.25

Airborne-Unlimited-03.12.25

Airborne-AffordableFlyers-03.13.25

Airborne-Unlimited-03.14.25

Wed, Nov 05, 2003

Navy EA-6B Fighting Fatigue

19 Down (Temporarily), 24 To Go

Naval Air Systems Command (NAVAIR) removed 19 EA-6B "Prowlers" from service Sept. 23, for repairs and maintenance due to structural fatigue damage, with 24 additional aircraft to follow within two months.

The reduction in active aircraft inventory is the result of recently completed engineering evaluations of structural health and reduced risk-to-tolerance commensurate with world events. The Navy continues to optimize available EA-6B resources to best support current operational and training requirements, while keeping crew-safety the top priority.

The number of Prowlers will be reduced from 95 to 71 until spring, primarily to induct high fatigue aircraft with Wing Center Sections and Outer Wing Panels issues into depot maintenance for wing replacement.

Currently, the EA-6B is the most capable and only tactical electronic attack aircraft in DoD inventory. The Navy has worked very closely with other services to balance joint and naval operational requirements against available EA-6B aircraft. According to NAVAIR officials, the road ahead involves the carefully designed disestablishment of one of the Navy's four expeditionary squadrons, which dually provides an opportunity to achieve force reductions, while still fulfilling all joint and naval requirements.

The new breakdown of squadrons would include Navy Carrier Squadrons (30 aircraft), Navy Expeditionary Squadrons (9 aircraft), Marine Expeditionary Squadrons (15), Fleet Replacement (13), Navy Reserve (2) and Testing (2 aircraft). All of these initiatives are to help sustain the EA-6B fleet until the introduction of the highly anticipated EA-18G beginning 2009.

The EA-6B could return to pre-Operation Iraqi Freedom numbers in approximately 24 months. The Navy remains committed to providing electronic warfare capability to combatant commanders to support ongoing real-world requirements. [ANN Thanks Journalist 2nd Class Kimberly Rodgers, Navy News Service, for the report]

FMI: www.navy.mil. www.navair.mil

Advertisement

More News

Airborne 03.07.25: Titan Getting New Home, False Alerts, F16s v TFR Violators

Also: Silver Airways BK, New DCA Regs, LockMart Out of Navy Bid, ANN’s AEA LIVE Webcast Schedule Air Cover Engineering, which acquired Titan Aircraft’s assets in Decemb>[...]

Aero-News: Quote of the Day (03.11.25)

"We are pleased by the rapid compliance across the Department with the directive removing DEI content from all platforms. In the rare cases that content is removed that is out of t>[...]

ANN's Daily Aero-Term (03.11.25): Convective SIGMET

Convective SIGMET A weather advisory concerning convective weather significant to the safety of all aircraft. Convective SIGMETs are issued for tornadoes, lines of thunderstorms, e>[...]

Airborne-Flight Training 03.06.25: Alaska-Hawaiian, ATC Hires, PanAm Flt Academy

Also: Av Mx Apprenticeship, Sama Diamond DA40, ALPA on Safety, AvGas Alarm ALPA has confirmed that Pilots for Alaska Airlines and Hawaiian Airlines have opened negotiations with Al>[...]

Airborne 03.05.25: AvGas Alarm, Me 262 to Oshkosh?, CAF Heads For SnF25!

Also: NTSB Spanks FlexJet, SpaceX at FAA, WWII MIA Found, Scottsdale Learjet A state court in California is poised to potentially eliminate the sale of leaded avgas when it rules o>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC