Discovery External Tank Repairs Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, Jan 04, 2011

Discovery External Tank Repairs Underway

Engineers Analyze Data On All 108 Stringers

Technicians working on space shuttle Discovery's external fuel tank in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida began repairs Monday on three support beams, called stringers, that recently were detected to have small cracks on their tops.

Engineers at various NASA centers continue to analyze data from testing and X-ray type image scans collected during the past week of all 108 stringers on the outside of the external tank's intertank section. The image scans showed four small cracks on three stringers on the opposite side of the tank from Discovery. Managers decided Thursday to have those cracks repaired in a similar fashion to repairs made on cracks on two stringers found after Discovery's Nov. 5 launch attempt.

The repair work is estimated to take 2-3 days. Any further work will be evaluated thoroughly during the week after additional data and analysis are reviewed.

Technicians at NASA's Kennedy Space Center in Florida will also begin modifications to 34 additional stringers on space shuttle Discovery's external fuel tank on Tuesday. Crews will fit pieces of metal, called radius blocks, over the tops of the stringers located at the external tank's thrust panel area to increase the structural support of the stringers. The thrust panel areas are located at the attachment points between the tank and the solid rocket boosters, which see the most stress during the flight into orbit.

The work is expected to take approximately one week. Teams currently are performing scans on all of the tank's stringers using a backscatter device, which bounces radiation off the tank allowing engineers to see below the foam insulation. Engineers at various NASA centers continue to analyze testing and imaging data. Managers will meet again Thursday to determine whether radius block modifications are needed on the remaining stringers.


Discovery Tank Repairs

The next available launch date for Discovery's STS-133 mission to the International Space Station remains Feb. 3 at the opening of a window that extends through Feb. 10.

FMI: www.nasa.gov

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC