First P-8A Poseidon In-Flight Mission Systems Tests Successfully Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Jun 18, 2010

First P-8A Poseidon In-Flight Mission Systems Tests Successfully Completed

Three-Hour Flight Tested All Operator Workstations

P-8A Poseidon aircraft T2 successfully completed the program's first mission systems test flight on June 8 in Seattle, Boeing announced Thursday. T2 will be used to verify integrated mission systems performance during flights in Seattle and at Naval Air Station Patuxent River, MD.


P-8 Poseidon T2 File Photo

During the three-hour flight, the joint Boeing and Navy test team exercised mission computing on all five operator workstations and successfully demonstrated key systems -- including acoustics, mission planning, tactical data-link, communications, electronic support measures and flight test instrumentation -- for the first time.

"This successful flight moves us a step closer to getting the Poseidon and its next-generation radar and sensors into the hands of the warfighter," said Chuck Dabundo, Boeing vice president and P-8 program manager. "Future flights will demonstrate the state-of-the-art systems that will provide the Navy superior performance well into the 21st century."


P-8 Poseidon File Photo

T2 is one of five test aircraft that are being assembled and tested as part of the U.S. Navy System Development and Demonstration contract Boeing received in 2004. Boeing's T1 airworthiness-test aircraft entered flight testing in October 2009 and arrived at the Navy's Patuxent River facility in April 2010.

The Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC