AD: Dassault Aviation Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Dec 26, 2019

AD: Dassault Aviation Airplanes

AD NUMBER: 2019-24-11

PRODUCT: Certain Dassault Aviation Model FALCON 900EX airplanes.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-16-26 and AD 2017-19-04, which applied to certain Dassault Aviation Model FALCON 900EX airplanes.

Those ADs required revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive maintenance requirements and/or airworthiness limitations.

Since the FAA issued AD 2014-16-26 and AD 2017-19-04, the FAA determined that new or more restrictive airworthiness limitations are necessary.

This AD continues to require those maintenance or inspection program revisions, and also requires revising the existing maintenance or inspection program, as applicable, to incorporate additional new or more restrictive airworthiness limitations.

DATES: This AD is effective January 24, 2020.

COST: The FAA estimates that this AD affects 100 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The FAA estimates the total cost per operator for the retained actions from AD 2017-19-04 to be $7,650 (90 work-hours x $85 per work-hour).

The FAA has determined that revising the existing maintenance or inspection program takes an average of 90 work-hours per operator, although the agency recognizes that this number may vary from operator to operator.

In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate. The FAA estimates the total cost per operator for the new actions to be $7,650 (90 work-hours x $85 per work-hour).

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC