NASA's Space Shuttle Discovery Set To Roll To Launch Pad | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, Apr 02, 2005

NASA's Space Shuttle Discovery Set To Roll To Launch Pad

Space Shuttle Discovery is set to roll out to Launch Pad 39B at NASA's Kennedy Space Center (KSC), Fla. First motion is currently targeted for 12:01 a.m. EDT Tuesday, April 5.

The fully-assembled Space Shuttle Vehicle, or "stack," -- consisting of the orbiter, External Tank (ET) and twin Solid Rocket Boosters (SRBs) -- will be mounted on the Mobile Launcher Platform and delivered to the pad via a crawler transporter. The four-mile journey from the Vehicle Assembly Building (VAB) to the pad will take about six hours.

Discovery's initial move to Launch Pad 39B will be covered live on NASA Television. Live commentary will begin at the first motion of the crawler transporter and continue for about 30 minutes.

NASA TV is available via satellite in the continental U.S. on AMC-6, Transponder 9C, C-Band, at 72 degrees west longitude. The frequency is 3880.0 MHz. Polarization is vertical, and audio is monaural at 6.80 MHz. In Alaska and Hawaii, NASA TV is available on AMC-7, Transponder 18C, C-Band, at 137 degrees west longitude. The frequency is 4060.0 MHz. Polarization is vertical, and audio is monaural at 6.80 MHz. NASA TV is also available on the Internet at www.nasa.gov/ntv.

Launch of Discovery on its Return to Flight mission, designated STS-114, is targeted for May 15 with a launch window that extends to June 3.

During its 12-day mission, Discovery's seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.

Discovery was moved from Orbiter Processing Facility on March 29 to the VAB and attached to its propulsion elements, a redesigned ET and twin SRBs.

In preparation for rollout to the launch pad, work in the VAB included the installation of a new digital camera, testing electrical and mechanical attachments between the orbiter and ET, and umbilical checks.

FMI: www.nasa.gov/returntoflight, www.nasa.gov/ntv

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC