Running Hot And Cold On The Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Apr 24, 2010

Running Hot And Cold On The Dreamliner

787 Undergoing Extreme-Weather Testing In Florida

The 787 Dreamliner has begun a series of extreme-weather tests at Valparaiso, FL. A special hangar at the McKinley Climatic Laboratory at Elgin Air Force Base allows the airplane to experience heat as high as 115 degrees Fahrenheit and as low as minus 45 degrees Fahrenheit.

After the airplane is stabilized at either the hot or cold temperatures, flight test technicians will follow the Airplane Maintenance Manual to perform the steps required to prepare the airplane for flight release and operate under these conditions. Sensors and monitors will allow the test team to determine if all systems hardware and software operate as expected.

Cold-weather testing is being conducted first, with preliminary hot-weather testing to follow. Additional extreme-weather testing will be conducted later in the flight test program.

"We have Dreamliner customers who will operate the 787 in a wide variety of environments throughout the world," said Scott Fancher, vice president and general manager of the 787 program for Boeing Commercial Airplanes. "This testing is about ensuring that the airplane meets the expectations of our customers."

A crew of approximately 100 people traveled from Seattle to support the test operations on ZA003, the third 787 airplane to be built.

The McKinley Climatic Laboratory is the second remote testing location for the 787 Dreamliner. The second airplane in the fleet, ZA002, performed a variety of tests in Victorville, CA, last month. The testing in Florida is expected to last nearly two weeks.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (09.13.25): Center Weather Advisory

Center Weather Advisory An unscheduled weather advisory issued by Center Weather Service Unit meteorologists for ATC use to alert pilots of existing or anticipated adverse weather >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

ANN's Daily Aero-Linx (09.13.25)

Aero Linx: International Airline Medical Association (IAMA) The International Airline Medical Association (IAMA), formerly known as the Airline Medical Directors Association (AMDA)>[...]

Classic Aero-TV: Hover Camera Passport - A Gesture Controlled Selfie Drone

From 2017 (YouTube Edition): It’s So Simple to Operate, Anyone Can Do It… And We’re Not Kidding The drones were up and flying at the Consumer Electronics Show he>[...]

Airborne-NextGen 09.09.25: Textron Nixes ePlane, Joby L/D Flt, Swift Approval

Also: Space Command Moves, Alpine Eagle, Duffy Names Amit Kshatriya, Sikorsky-CAL FIRE Collab Textron eAviation is putting the development of its Nexus electric vertical takeoff an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC