Spacewalkers Complete Installation Of Ammonia Pump Module | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Dec 27, 2013

Spacewalkers Complete Installation Of Ammonia Pump Module

Cooling System Now Considered To Be 'Fully Operational' Following Repairs

Spacewalkers Rick Mastracchio and Mike Hopkins completed a second spacewalk to install a spare ammonia pump module on Christmas Eve. The U.S. Quest airlock began repressurization at 1423 EDT Tuesday signaling the official end of their spacewalk.

Tuesday’s main tasks included the removal and installation of a spare pump module. The first task was to remove the spare pump module from the space station’s External Stowage Platform-3. After that was completed, the module was bolted to the S1 truss and connected to Loop A of the station’s external Active Thermal Control System.

Hopkins attached himself to the Canadarm2 and took a ride to the worksite. Mastracchio tethered himself to the station and translated to the S1 truss to assist his partner. Japanese astronaut Koichi Wakata operated the Canadarm2 from inside the Destiny laboratory. While doing the connection work, the duo demated ammonia fluid lines from a jumper box that enabled ammonia flow during the repair spacewalks. After experiencing some difficulty disconnecting a fluid line the spacewalkers reported seeing ammonia flakes escaping a valve. As a precaution, mission controllers asked the spacewalkers to inspect their spacesuits for possible ammonia contamination. Once they were back in the Quest airlock the duo conducted more ammonia decontamination procedures on their spacesuits. All four fluid lines were successfully reconnected to the newly installed pump module restoring ammonia flow.

Afterward, Hopkins and Mastracchio completed electrical connections to the pump module. Power was successfully restored to the ammonia pump module. Flight controllers in the Mission Control Center at NASA's Johnson Space Center in Houston successfully restarted the new pump Tuesday night. The pump module controls the flow of ammonia through cooling loops and radiators outside the space station, and, combined with water-based cooling loops inside the station, removes excess heat into the vacuum of space. The new pump now is considered fully functional.

The duo was originally scheduled to finish the installation work on Monday before mission controllers detected a spacesuit configuration issue at the end of Saturday’s spacewalk, in which the spacewalkers removed a faulty pump that experienced a problem with its internal flow control valve Dec. 11.

The suspect pump was removed from the starboard truss and parked in a temporary location on the station’s Mobile Base System rail car where it can stay until at least next June. Managers decided an extra day of preparation was necessary to get a backup spacesuit ready for Mastracchio.

(Pictured: Top: NASA astronaut Rick Mastracchio participates in the first Expedition 38 spacewalk designed to troubleshoot a faulty coolant pump on the International Space Station. Bottom: Astronaut Mike Hopkins prepares to attach himself to a foot restraint on the Canadarm2 outside the International Space Station. NASA images)

FMI: www.nasa.gov

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC