AD: Sikorsky Aircraft Corporation Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Sep 27, 2018

AD: Sikorsky Aircraft Corporation Helicopters

AD NUMBER: 2018-19-09

PRODUCT: Sikorsky Aircraft Corporation (Sikorsky) Model S-92A helicopters.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-14-03 for the aircraft listed above.

AD 2017-14-03 required an inspection and reduced the retirement lives of certain landing gear components.

This new AD retains the requirements of AD 2017-14-03, reduces the retirement lives of additional landing gear components, and requires repeating the inspection.

This AD was prompted by a revised analysis of the fatigue life of the landing gear.

COST: The FAA estimates that this AD affects 80 helicopters of U.S. Registry. The cost of compliance is estimated as follows:
At an average labor rate of $85 per work-hour:

  • Replacing a wheel axle P/N 2392-2334-001 requires 2 work-hours and required parts cost $22,000, for a cost per helicopter of $22,170.
  • Replacing a main landing gear (MLG) or NLG threaded hinge pin P/N 2392-2311-003 requires 1 work-hour and required parts cost $3,800, for a cost per helicopter of $3,885.
  • Replacing a NLG cylinder P/N 2392-4006-005 requires 1 work-hour and required parts cost $27,200, for a cost per helicopter of $27,285.
  • Replacing a NLG hinge pin P/N 2392-4312-003 requires 1 work-hour and required parts cost $4,400, for a cost per helicopter of $4,485.
  • Replacing a landing gear actuator rod end P/N 2392-0876-901 requires 1 work-hour and required parts cost $900, for a cost per helicopter of $985.
  • Replacing a MLG cylinder P/N 2392-2006-005 requires 2 work-hours and required parts cost $33,100, for a cost per helicopter of $33,270.
  • Replacing a MLG pin outboard P/N 2392-2312-003 requires 1 work-hour and required parts cost $4,300, for a cost per helicopter of $4,385.
  • Replacing a MLG bulkhead left-hand side P/N 92201-08111-105, -107, and -109 requires 70 work-hours and required parts cost $12,550, for a cost per helicopter of $18,500.
  • Replacing a MLG bulkhead right-hand side P/N 92201-08111-106, -108, and -110 requires 70 work-hours and required parts cost $12,550, for a cost per helicopter of $18,500.
  • Inspecting the NLG airframe fitting assembly P/N 92209-01101-041 requires 8 work-hours, and required parts cost is minimal, for a cost of $680 per helicopter and $54,400 for the U.S. fleet, per inspection cycle.
  • If required, replacing a NLG actuator fitting P/N 92209-01101-101 requires 70 work-hours, and required parts cost $10,000, for a cost per helicopter of $15,950.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC