AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.09.24

Airborne-NextGen-09.10.24

Airborne-Unlimited-09.11.24

Airborne-AffordableFlyers-09.12.24

Airborne-Unlimited-09.13.24

Sat, Jul 24, 2021

AD: General Electric Company Turbofan Engines

AD 2021-14-11 Prompted By An Inspection By The Manufacturer That Revealed Cracking Of The HPT Rotor Stage 1 Disk

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) CF6-80A and CF6-80C2 model turbofan engines.

This AD was prompted by an inspection by the manufacturer that revealed cracking of the high-pressure turbine (HPT) rotor stage 1 disk. This AD requires visual inspection and fluorescent penetrant inspection (FPI) of the HPT thermal shield and, if cracking is detected, removal from service of the HPT thermal shield, HPT rotor stage 1 disk and HPT rotor stage 2 disk. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective August 27, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all General Electric Company (GE) CF6-80A, CF6-80A1, CF6-80A2, CF6-80A3, CF6-80C2A1, CF6-80C2A2, CF6-80C2A3, CF6-80C2A5, CF6-80C2A5F, CF6-80C2A8, CF6-80C2B1, CF6-80C2B1F, CF6-80C2B1F1, CF6-80C2B1F2, CF6- 80C2B2, CF6-80C2B2F, CF6-80C2B3F, CF6-80C2B4, CF6-80C2B4F, CF6-80C2B5F, CF6-80C2B6, CF6-80C2B6F, CF6-80C2B6FA, CF6-80C2B7F, CF6-80C2B8F, CF6-80C2D1F, CF6-80C2K1F, and CF6-80C2L1F model turbofan engines. The NPRM published in the Federal Register on February 22, 2021 (86 FR 10496). The NPRM was prompted by an inspection by the manufacturer that revealed cracking of the HPT rotor stage 1 disk caused by increased stress on the HPT rotor stage 1 disk as a result  of flangeto-flange cracking on the HPT thermal shield. In the NPRM, the FAA proposed to require visual inspection and FPI of the HPT thermal shield and, if cracking is detected, removal from service of the HPT thermal shield, HPT rotor stage 1 disk and HPT rotor stage 2 disk. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Linx (09.14.24)

Aero Linx: The Canadian Business Aviation Association (CBAA) The Canadian Business Aviation Association (CBAA) is a non-profit association formed in 1961 as Canada's voice for busi>[...]

Aero-News: Quote of the Day (09.14.24)

"A lot of the members are pretty upset about our first offer... We're hoping that the second offer is what we're looking for, If not ... we're going to keep striking and stand up f>[...]

ANN's Daily Aero-Term (09.14.24): Calibrated Airspeed (CAS)

Calibrated Airspeed (CAS) The indicated airspeed of an aircraft, corrected for position and instrument error. Calibrated airspeed is equal to true airspeed in standard atmosphere a>[...]

Airborne 09.09.24: Aeroprakt For Handicap, Starliner Return, Doj v Maduro

Also: CAF’s TBM Avenger, AZ Lasers, C-130 Celebrates 70th, First EA-37B AeroPrakt exhibited the handicap-friendly variation of their A-22LS at the 2024 Midwest Aviation Expo.>[...]

Klyde Morris (09.13.24)

Yeah... Klyde is A Space Geek... Who Knew? FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC