FAA Expands Boeing Commercial Airplanes Production Certificate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.09.25

Airborne-NextGen-06.10.25

AirborneUnlimited-06.11.25

Airborne-AffordableFlyers-06.12.25

AirborneUnlimited-06.06.25

Fri, Jun 29, 2012

FAA Expands Boeing Commercial Airplanes Production Certificate

South Carolina Operation Added After Demonstrating It Meets FAA Requirements

The FAA has added Boeing's South Carolina operations to the company's Commercial Airplanes production certificate, PC 700. The production certificate allows the company to produce and sell commercial airplanes.

"This is a very exciting day for Boeing South Carolina, the South Carolina Interiors Responsibility Center, and Boeing Commercial Airplanes," said Jack Jones, Boeing South Carolina vice president and general manager, announcing the move Wednesday. "Earning the right to join the production certificate is a significant achievement that validates Boeing South Carolina as a producer of commercial airplanes that meet the FAA's requirements and Boeing's high standards."

The certificate is issued once an airplane manufacturer has demonstrated to the FAA that its facilities and quality management system meet the agency's stringent safety and reliability requirements.

Boeing South Carolina's addition to the Boeing production certificate follows an extremely successful FAA Manufacturing Inspection District Office audit that validated the sites' compliance with the Boeing Quality Management System. "Our challenge now is to improve even more on our abilities, knowledge, and skill that were so favorably acknowledged during the audit. I believe we will do just that, because of the personal ownership and accountability of the Boeing South Carolina team," said Jones.

(SC Assembly Plant photos provided by Boeing)

FMI: www.faa.gov, www.boeing.com


Advertisement

More News

Aero-News: Quote of the Day (06.10.25)

“The Army is investing in its future warfighters, and that means delivering training tools that truly reflect operational reality. The MD 530F is not just ready for that miss>[...]

NTSB Final Report: Arthur B Canning Merlin Lite

Contributing To The Outcome Was The Pilot’S Failure To Maintain Airspeed And His Exceedance Of The Motorglider’S Critical Angle Of Attack Analysis: The kit manufacturer>[...]

ANN's Daily Aero-Linx (06.10.25)

Aero Linx: National Warbird Operator Conference Founded in 1993, the annual NWOC event brings together warbird owners, operators, and museum directors to address particular events >[...]

ANN's Daily Aero-Term (06.11.25): Obstacle

Obstacle An existing object, object of natural growth, or terrain at a fixed geographical location or which may be expected at a fixed location within a prescribed area with refere>[...]

ANN's Daily Aero-Linx (06.11.25)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC