AD: Piper Aircraft, Inc. | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Apr 06, 2018

AD: Piper Aircraft, Inc.

AD NUMBER: 2018-07-03

PRODUCT: Certain Piper Aircraft, Inc. Models PA-28-140, PA-28-150, PA-28-151, PA-28-160, PA-28-161, PA-28-180, PA28-181, PA-28-236, PA-28-201T, PA-28R-180, PA-28R-200, PA-28R-201, PA-28R-201T, PA28RT-201, and PA-28RT-201T airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2018-02-05 for the aircraft listed above.

AD 2018-02-05 required inspecting the fuel tank selector cover to verify the left and right fuel tank selector placards are located at the proper positions and replacing those that are improperly located with new placards.

This AD addresses the same unsafe condition and requires the same actions as AD 2018-02-05, but changes the inspection of the fuel tank selector cover to a preflight check and allows for various fuel selector clocking configurations. This AD was prompted by our determination to allow the owner/operator (pilot) holding at least a private pilot certificate to perform the preflight check.

The FAA is issuing this AD to allow the pilot to do a preflight check of the fuel selector placards.

DATES: This AD is effective April 20, 2018. Comments must be received by May 21, 2018.

COST: The FAA estimates that this AD affects 17,957 airplanes, of U.S. registry. Since this AD allows the owner/operator (pilot) holding at least a private pilot certificate to perform the required preflight check of the fuel tank selector placards, there is a reduction in cost associated with this AD.

The FAA estimates the following costs to do any necessary replacements that will be required based on the results of the preflight check of the left and right fuel tank selector placards for proper installation inspection. The agency has no way of determining the number of aircraft that might need this replacement. If replacement is necessary, the estimated cost is $51.76 for parts and labor.

FMI: AD

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC