AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 12, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-14-06

PRODUCT: Certain Airbus SAS Model A319-111, -112, -115, and -131 airplanes, and Model A320-214 and -232 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: This AD was prompted by a report of the fracture of a main landing gear (MLG) sliding tube axle, and an investigation that determined the cause to be an incorrect repair.

This AD requires a repetitive magnetic particle inspection (MPI) of affected MLG sliding tubes for discrepancies; a one-time Barkhausen noise inspection (BNI) or alternative non-destructive test (NDT) inspection, and a detailed visual inspection of affected MLG sliding tube axles for discrepancies; and corrective actions if necessary, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

Accomplishing the BNI and applicable corrective actions, or replacing the affected parts, constitutes terminating action for the repetitive MPI.

DATES: This AD becomes effective August 23, 2019. Comments must be received by September 23, 2019.

COST: The FAA estimates that this AD affects 1 airplane of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Labor: Up to 14 work-hours × $85 per hour = Up to $1,190 per aircraft
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC