AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Sep 06, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-17-18

PRODUCT: All Airbus Model A330-200, A330-200 Freighter, and A330-300 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2015-02-17, which applied to the aircraft listed above.

AD 2015-02-17 required revising the electrical emergency configuration procedure in the Emergency Procedures section of the airplane flight manual (AFM) to include procedures for deploying the ram air turbine manually to provide sufficient hydraulic power and avoid constant speed motor/generator (CSM/G) shedding.

Since AD 2015-02-17 was issued, the FAA has determined that replacement or modification of the two flight warning computers (FWCs) is necessary to address the identified unsafe condition. This AD requires the replacement or modifications of the two FWCs.

This AD also removes airplanes from the applicability.

DATES: This AD is effective October 5, 2018.

COST: The FAA estimates that this AD affects 105 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • 4 work-hour × $85 per hour = $340 per aircraft.
FMI: AD

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC