Boeing Breaks Ground, Unveils Design For New Everett Delivery Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Mar 07, 2012

Boeing Breaks Ground, Unveils Design For New Everett Delivery Center

Construction Begins On New Facility Set To Open In 2013

Boeing on Monday officially began construction on its new enhanced Everett Delivery Center (EDC) with a groundbreaking ceremony attended by Boeing employees, customers and local dignitaries. "Our customers are demanding our products like never before," said Jeff Klemann, vice president of the delivery center. "As we build more airplanes at faster and faster rates, we also need a world-class facility to conduct our delivery operations. The new Everett Delivery Center will be more than just a building; it's an investment in our customers, our local community, our employees and Boeing's future."

The new facility will feature three times the office, conference and delivery operations space as the current EDC. The design includes a customer complex and delivery lounge to enhance the customer experience, as more than 150 customer representatives work on-site in the EDC. "Today's a day for celebration," said Klemann "We've delivered over 3,500 airplanes from our old center, and it served us well. Today's event leading to next year's delivery center opening ensures that Everett will be delivering wide-body aircraft for decades to come."

The new EDC is expected to open for operation in early 2013. Plans are in place to ensure seamless deliveries during the interim period.

The EDC, central to Boeing's Everett site operations, houses major functions and personnel related to the delivery of its 747, 767, 777 and 787 commercial airplanes.

FMI: www.boeing.com


Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC