Nose Job: Airbus Gets First A380 Nose Gear | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jan 21, 2004

Nose Job: Airbus Gets First A380 Nose Gear

Largest Gear Ever Supplied By Messier-Dowty

On Monday, Messier-Dowty announced the delivery of the first test A380 nose landing gear to Airbus UK. Standing at 4.8 meters tall when fully extended, the A380 nose landing gear is the largest landing gear ever supplied by Messier-Dowty to Airbus. The gear will be fitted to the Airbus system test rig located in Filton, England to allow Airbus UK to perform the aircraft systems testing validation.

"This hand over of the first A380 nose landing gear marks the latest milestone in Messier-Dowty’s long and successful history with Airbus," said Louis Le Portz, chairman and CEO.  "As landing gear supplier for all existing Airbus in service aircraft, Messier-Dowty is proud of its contribution to the world’s largest airliner."

Messier-Dowty was selected in 2001 to design, manufacture, test and support the nose landing gear for the Airbus A380. The nose gear development benefits from Messier-Dowty's extensive experience on previous Airbus aircraft, including the A340-600, and will ensure a future growth capability of the aircraft up to 620 tons.

This nose landing gear introduces new innovations in terms of landing gear development, namely the introduction of 350-bar hydraulic pressure never before used on large commercial aircraft, as well as the use of an HVOF (High Velocity Oxygen Fuel) surface treatment process instead of chromium plating.  Main components of the A380 nose landing gear, such as the main fitting and sliding tube, will be produced in Montreal, Canada and in Bidos, France, respectively. Bidos will also serve as the center for final assembly. Main testing for the nose landing gear will take place in Gloucester, UK and at the CEAT center in Toulouse, France. Eight A380 nose landing gear shipsets will be manufactured in 2004.

The maiden flight for the A380 is scheduled for early 2005 with entry in service scheduled for 2006. The Airbus order book for the A380 now stands at 129 aircraft.

Messier-Dowty, a Snecma Group company, designs, develops, manufactures and supports landing gear systems. 

FMI: www.messier-dowty.com

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC